feasibility and density studies | BAR, ARB, SUP & Planning Commission approval | site analysis and masterplanning
Route 250 Masterplan
Brewery, Distillery, and Restaurant
District: Crozet, VA
The unexpected purchase of some adjacent land required the owner of an existing successfully brewery along the successful Brew Ridge Trail required quick planning and site analysis.
Given a limited time of study, Design Develop was tasked with discerning the client's goals and then determining the best plan of action for the additional lot. Studying everything from regional precedents to local zoning code to views / sun angles on the site, we planned for long term growth while keeping an eye on near future deadlines and required decisions.
Title Page
Client Goals
Food Truck Perspective
Title Page
1/24
![]() Title Page | ![]() Client Goals | ![]() Regional Precedents | ![]() Regional Precedents | ![]() Precedent Imagery | ![]() Existing Zoning Conditions | ![]() Existing Topo Conditions |
---|---|---|---|---|---|---|
![]() Objective 1 : New Building | ![]() Objective 1 Challenges | ![]() Objective 2 : Brewery Parking | ![]() Objective 3 : Distillery Parking | ![]() Objective 3 : Optional Ring Road | ![]() Objective 4 : Expand Existing | ![]() Objective 5 : Improve Pedestrian |
![]() Objective 5 : Create Patios | ![]() Objective 5 : Central Courtyard | ![]() Objective 6 : Cohesion | ![]() Objective 6 : Cohesion | ![]() Objective 6 : Cohesion | ![]() From Distillery Patio Out | ![]() From Restaurant Patio In |
![]() From Food Trucks Out | ![]() Aerial PErspective | ![]() Perspective at Foor Trucks |